777PACK

Project Overview

ItemDetails
LocationBawen
Bottle Size600ml PET Bottle
Production Capacity12,000 Bottles Per Hour
ApplicationBottled Drinking Water Production
SolutionAutomatic Water Filling Line

Project Background

This project is a 12000 BPH bottled water filling line installed for a bottled water manufacturer located in Bawen.

The customer supplies bottled drinking water to local supermarkets, retail stores and regional distributors. With increasing market demand, the existing production capacity could no longer meet the required output.

To expand production and improve packaging efficiency, the customer decided to install a fully automatic 12000 bottles per hour water filling line for 600ml PET bottles.

The new production line allows the factory to achieve higher production capacity, improved operational stability and consistent product quality.


Production Line Configuration

The bottled water production line includes several key machines and systems designed for efficient and stable operation.


Air Conveyor System

The air conveyor system is used to transport empty PET bottles from the bottle blowing machine to the water filling machine.

This system uses high-speed airflow to move bottles smoothly while preventing bottle deformation or damage.

Main advantages include:

Stable bottle transportation

Reduced mechanical contact

High transport efficiency


3-in-1 Rinsing Filling Capping Machine

The 3-in-1 water filling machine is the core equipment of the bottled water production line.

It integrates three processes in one compact system:

Bottle rinsing

Water filling

Bottle capping

This integrated design helps improve production efficiency and reduces the overall footprint of the production line.

The filling machine is suitable for high-speed bottled water production using PET bottles.


Linear Labeling Machine

After filling and capping, bottles enter the automatic linear labeling machine.

This machine applies self-adhesive labels to PET bottles with high precision and stable operation.

Key features include:

Accurate label positioning

Stable labeling performance

Easy adjustment for different bottle sizes


Production Process

The bottled water production process in this project includes the following steps:

1️⃣ Empty bottles are transported from the bottle blowing machine to the filling system through the air conveyor.

2️⃣ Bottles enter the 3-in-1 rinsing, filling and capping machine, where they are cleaned, filled with drinking water and sealed with caps.

3️⃣ Filled bottles are transferred through the conveyor system to the labeling machine.

4️⃣ The linear labeling machine automatically applies product labels to each bottle.

5️⃣ Labeled bottles are then transported to the downstream packing system.


Installation and Commissioning

The installation and commissioning of the water filling line were completed by our local engineer team in Indonesia.

Our engineers provided:

Equipment installation 

System integration and debugging

Operator training

Production testing

After commissioning, the water filling line achieved stable operation at the design capacity of 12,000 bottles per hour.


Project Result

After the installation of the new bottled water production line, the customer achieved several operational improvements:

Increased production capacity

Improved production efficiency

Stable and reliable equipment operation

Better product appearance and packaging consistency

The project successfully enhanced the customer’s bottled water manufacturing capability in the Bandung market.